3D printing Aerodynamic engineering Aeronautical engineering Aeronautical engineering books Airports Architecture Artificial intelligence Automobiles Blast Resistant Design Books Bridges Building Codes Cabin Systems Civil Engineering Codes Concrete Conferences Construction Management Construction Materials Cooling Cryptocurrency Dams Do it Yourself Docks and Harbours Downloads Earthquake Engineering Electronics Engineering Engines Environmental Design & Construction Environmental Engineering Estimation Fluid Mechanics Fluid Mechanics Books Formwork design foundation engineering General Geotech Books Geotechnical Engineering Global Positioning System HVAC Hydraulics Hydraulics Books Hydro Power Hydrology Irrigation Engineering Machinery Magazines Management Books Masonry Mechanical Engineering Mechanics Mechanics Books Miscellaneous Books Modern Steel Construction Nanotechnology Natural Hazards Network Security Engineer Networking Systems News Noise and Attenuation Nuclear Engineering Nuclear Hazards to Buildings Pavement Design Prestressed Concrete Project Management Project Management Books Quantity Survey Quantity Survey Books railways RCC Structural Designing Remote Sensing Remote Sensing and GIS Books Renewable Energy Reports Resume Roads scholarships Smart devices Software Software Engineering Soil Mechanics Solar Energy Special Concrete Spreadsheets Steel Steel Spreadsheets Structural Analyses structures Structures Books Surveying Surveying Books Testing Thermodynamics Thesis Transportation Books Transportation Engineering Tunnel Engineering Wind Energy Zero Energy Buildings

The Slump Test

Slump, as it relates to concrete, is a measure of consistency equal to the decrease in height, measured to the nearest 1⁄4 inch (6 mm) of the molded mass immediately after it has been removed from this molded mass created by the “slump cone.”
The mold is in the form of a frustum (part of a solid cone intersected by the use of parallel lines) 12 inch (2.5 cm) high with a base diameter of 8 inches (2 cm) and a top diameter of 4 inches (1 cm). This mold (slump cone) is filled with freshly mixed concrete in 3 layers, each being rodded with a 5⁄8 inch (15.9 mm) bullet shaped rod 25 times. When the mold has been filled, the top is struck off and the mold is lifted. The amount by which the mass settles after mold removal is referred to as “slump.” A small slump is an indication of a very stiff mix and a very large slump is indicative of a very wet consistency.
Recommended slumps are:
Type of construction
Maximum slump (inches)
Minimum slump (inches)
Reinforced walls/footings
3
1
Caissons, substructure walls
3
1
Beams, reinforced walls
4
1
Building columns
4
1
Pavements, slabs
3
1
Mass concrete
2
1

Rule of Thumb: To raise the slump 1 inch (25.4 mm), add 10 pounds of water for each cubic yard of concrete. (One gallon of water equals 8.33 pounds.)
Slump Cone
Slump Cone


[blogger]

Author Name

Engineeersdaily

Contact Form

Name

Email *

Message *

Powered by Blogger.